Completed Projects
-
Refurbishment | Cambridge House, Aylesbury
Full design, specification, and contract administration services for this internal and external office and clinic refurbishment for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.
-
Repairs & Refurbishments | Warneford Hospital, Oxford
Various mental health internal anti-ligature ward and bathroom refurbishments, infection control works, fire safety works, access control, patient safety works, roof repairs, window repairs, anti-ligature window replacements, green transport works, and changing room refurbishments for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.
-
Building Survey | Cochrane UK Centre, Oxford
Full building survey for Cochrane UK (Cochrane UK is funded by the National Institute for Health and Care Research (NIHR) and hosted by the Oxford University Hospitals NHS Foundation Trust) for their Summertown Pavillion building, Oxford.
-
Refurbishment | Pharmacy Distribution Centre, Bicester
Full design, specification, drawings, tender, contract administration, and project management for a new pharmacy distribution building, Bicester, Oxfordshire. RIBA Stages 2-6.
-
Roof Refurbishment | Boundary Brook House, Oxford
Roof survey, design, specification and project management for this award-winning roof refurbishment for Oxford Health NHS Foundation Trust. RIBA Stages 2-6
-
Reflective Garden Design | Boundary Brook House, Oxford
A joint voluntary venture between contractor Mace, St Edwards School, and Jonathan Durndell MRICS. Jonathan provided design and project management services on behalf of Oxford Health NHS Foundation Trust. The reflective garden provides a quiet space for families, with scented plants, running water, and seating areas.
-
Roof Survey | Elms Centre, Banbury
Roof survey undertaken on all roofs and report detailing recommend repairs and maintenance, for Oxford Health NHS Foundation Trust.
-
Repairs & Maintenance | Clock House, Abingdon
Following a full building survey, internal and external repairs, maintenance, and decorations were designed, specified, and managed on-site to this Grade II* building (originally built in 1720s). RIBA Stages 2-6.
-
External & Internal Repairs & Maintenance - BBH Oxford
Oxford Health NHS Foundation Trust came to us to investigate several leaks. A full survey was undertaken and various defects were found. The works were listed in a schedule of works and tendered, which we managed to completion, including all making good to internal surfaces. RIBA Stages 2-6..
-
Green Transport Works | Witney Community Hospital
Design and specification of green car parking management work, including access control barriers, lighting, car park line marking and red routes, bollards, cycle shelters and wayfinding. RIBA Stages 2-6.
-
Building Surveying | Littlemore Mental Health Centre
Various projects undertaken including ward refurbishments, kitchen and WC refurbishments, anti-ligature upgrades, replacement fire doors, and fire safety works, access control works, external and internal decorations, roof repairs, and car parking safety works. RIBA Stages 2-6.
-
Internal & External Refurbishments | The Fiennes Centre, Banbury
Full design and project management of anti-ligature bedroom and shower room refurbishments at The Fiennes Centre, Banbury. Other projects included the application for planning permission to replace the existing windows for anti-ligature and robust windows, accessibility improvements to the main entrance, and thermal and fire safety surveys. RIBA Stages 2-6.
-
Anti-Ligature Refurbishments | Cotswold House, Littlemore
Design, specification, and contract administration for all anti-ligature WC, bathroom, and shower refurbishments at Cotswold House, Littlemore, Oxford. RIBA Stages 2-6.
-
Staff Changing Areas - Littlemore, Oxford
Encouraging more staff to use bicycles to work, we designed and managed this complete refurbishment to provide modern, clean shower and changing facilities. New green technology was installed such as heat pumps and LED lighting. RIBA Stages 2-6.
-
Patient Bedroom Refurbishments - Cotswold House, Littlemore
Design and project management of anti-ligature bedroom refurbishments, including replacement flooring, decorations, fire doors, window repairs, and anti-ligature ironmongery. RIBA Stages 2-6.
-
Replacement Skylights | Fulbrook Centre, Churchill Hospital, Oxford
Design and project management of skylights to live environment at Fulbrook Centre, Churchill Hospital, Oxford. Electronic opening devices and internal decorations. RIBA Stages 2-6.
-
Window & Door Repairs & Decorations - Warenford Hospital, Oxford
Site-wide window and door surveys followed by a schedule of works for repairs and decorations, for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.
-
New Road, Traffic Management & Access Barriers - Warenford Hospital, Oxford
New tarmac road with integrated sustainable drainage. Traffic management works including knee rail fencing, red route line marking, and access-controlled vehicle barriers, for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.
-
Accessible WC Refurbishments | Warneford Hospital, Oxford
Design and project management of accessible WCs within live public environments for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.
-
Anti-Ligature Ironmongery Upgrades | Oxfordshire & Buckinghamshire
Design and project management of anti-ligature ironmongery throughout the NHS Trust to windows and doors. Included full building survey, design, and contract administration. RIBA Stages 2-6. Oxford NHS Foundation Trust.
-
Damp Ingress Surveys | Banbury, Oxfordshire
Damp ingress survey to determine causes of water ingress. Defect diagnosis. Report and schedule of works. Horton General Hospital, Oxford University Hospitals NHS Trust.
-
Water Ingress Survey | Haddenham, Buckinghamshire
A water ingress survey was undertaken to determine the causes and remedial repairs to make the building watertight. NHS Property Services.
-
Fire, Insulation and Roof Surveys | Marlborough House, Milton Keynes Hospital
All roofs and voids were surveyed at Marlborough House (Milton Keynes) inpatient psychiatric ward for levels of insulation, fire stopping, and water ingress. Working within high security live environment.
-
Water Ingress Roof Survey | Harlow House, High Wycombe
The roof survey highlighted several defects including failed patch repairs to this asphalt roof. A full report was undertaken and recommendations for refurbishment/repairs, including potential thermal improvements.
-
Condensation Survey | Buckinghamshire
Our damp survey determined that the black mould growth to this ceiling was caused by lack of ventilation and lack of insulation to the roof, causing a large cold spot. A schedule of works was produced to refurbish the existing flat roof, with insulation over the deck (warm roof construction) and the installation of mechanical and natural ventilation to remove moist air from the building. The plasterboard ceilings were removed and new installed.
-
Roof Survey | Buckinghamshire
Our roof survey highlighted issues with the valley gutter, which was full of vegetation, causing internal water ingress. Problems with access made it hard to maintain. A report with recommendations was issued to NHS Property Services.
-
Internal Refurbishment | Wing Unit, Aylesbury
Full design and project management for the internal refurbishment of the Wing Unit, Aylesbury. A full refurbishment was carried out including new ceilings, plastering and decorations, new floors, replacement fire alarm, and electrical services, new WCs and kitchen. RIBA Stages 2-6.