Completed Projects

  • Cambridge_House_Refurbishment_Aylesbury

    Refurbishment | Cambridge House, Aylesbury

    Full design, specification, and contract administration services for this internal and external office and clinic refurbishment for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.

  • Warneford_Hospital_Refurbishments_Repairs_Oxford

    Repairs & Refurbishments | Warneford Hospital, Oxford

    Various mental health internal anti-ligature ward and bathroom refurbishments, infection control works, fire safety works, access control, patient safety works, roof repairs, window repairs, anti-ligature window replacements, green transport works, and changing room refurbishments for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.

  • UK_Cochrane_Centre_Building_Survey

    Building Survey | Cochrane UK Centre, Oxford

    Full building survey for Cochrane UK (Cochrane UK is funded by the National Institute for Health and Care Research (NIHR) and hosted by the Oxford University Hospitals NHS Foundation Trust) for their Summertown Pavillion building, Oxford.

  • Pharmacy_Distribution_Refurbishment

    Refurbishment | Pharmacy Distribution Centre, Bicester

    Full design, specification, drawings, tender, contract administration, and project management for a new pharmacy distribution building, Bicester, Oxfordshire. RIBA Stages 2-6.

  • Roof_Refurbishment_Boundary_Brook_House_Oxford

    Roof Refurbishment | Boundary Brook House, Oxford

    Roof survey, design, specification and project management for this award-winning roof refurbishment for Oxford Health NHS Foundation Trust. RIBA Stages 2-6

  • Reflective_Garden_Headington, Oxford

    Reflective Garden Design | Boundary Brook House, Oxford

    A joint voluntary venture between contractor Mace, St Edwards School, and Jonathan Durndell MRICS. Jonathan provided design and project management services on behalf of Oxford Health NHS Foundation Trust. The reflective garden provides a quiet space for families, with scented plants, running water, and seating areas.

  • Roof_Survey_Elms_Centre_Banbury

    Roof Survey | Elms Centre, Banbury

    Roof survey undertaken on all roofs and report detailing recommend repairs and maintenance, for Oxford Health NHS Foundation Trust.

  • External_Repairs_Maintenance_Clock_House_Abingdon

    Repairs & Maintenance | Clock House, Abingdon

    Following a full building survey, internal and external repairs, maintenance, and decorations were designed, specified, and managed on-site to this Grade II* building (originally built in 1720s). RIBA Stages 2-6.

  • Repairs_Maintenance_Boundary_Brook_House_Oxford

    External & Internal Repairs & Maintenance - BBH Oxford

    Oxford Health NHS Foundation Trust came to us to investigate several leaks. A full survey was undertaken and various defects were found. The works were listed in a schedule of works and tendered, which we managed to completion, including all making good to internal surfaces. RIBA Stages 2-6..

  • Witney_Community_Hospital_Green_Transport_Works

    Green Transport Works | Witney Community Hospital

    Design and specification of green car parking management work, including access control barriers, lighting, car park line marking and red routes, bollards, cycle shelters and wayfinding. RIBA Stages 2-6.

  • Building_Surveying_Oxford_Littlemore_Hospital

    Building Surveying | Littlemore Mental Health Centre

    Various projects undertaken including ward refurbishments, kitchen and WC refurbishments, anti-ligature upgrades, replacement fire doors, and fire safety works, access control works, external and internal decorations, roof repairs, and car parking safety works. RIBA Stages 2-6.

  • Building_Surveying_Banbury_Health

    Internal & External Refurbishments | The Fiennes Centre, Banbury

    Full design and project management of anti-ligature bedroom and shower room refurbishments at The Fiennes Centre, Banbury. Other projects included the application for planning permission to replace the existing windows for anti-ligature and robust windows, accessibility improvements to the main entrance, and thermal and fire safety surveys. RIBA Stages 2-6.

  • mental_health_refurbishment-anti-ligature

    Anti-Ligature Refurbishments | Cotswold House, Littlemore

    Design, specification, and contract administration for all anti-ligature WC, bathroom, and shower refurbishments at Cotswold House, Littlemore, Oxford. RIBA Stages 2-6.

  • Staff_Changing_Rooms_NHS_Oxford

    Staff Changing Areas - Littlemore, Oxford

    Encouraging more staff to use bicycles to work, we designed and managed this complete refurbishment to provide modern, clean shower and changing facilities. New green technology was installed such as heat pumps and LED lighting. RIBA Stages 2-6.

  • Mental_Health_Refurbishment_NHS_Building_Surveying

    Patient Bedroom Refurbishments - Cotswold House, Littlemore

    Design and project management of anti-ligature bedroom refurbishments, including replacement flooring, decorations, fire doors, window repairs, and anti-ligature ironmongery. RIBA Stages 2-6.

  • Replacement_Skylights_Roof_Oxford_NHS

    Replacement Skylights | Fulbrook Centre, Churchill Hospital, Oxford

    Design and project management of skylights to live environment at Fulbrook Centre, Churchill Hospital, Oxford. Electronic opening devices and internal decorations. RIBA Stages 2-6.

  • Window_Door_Refurbishments_NHS

    Window & Door Repairs & Decorations - Warenford Hospital, Oxford

    Site-wide window and door surveys followed by a schedule of works for repairs and decorations, for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.

  • Green_Transport_External_Works_NHS

    New Road, Traffic Management & Access Barriers - Warenford Hospital, Oxford

    New tarmac road with integrated sustainable drainage. Traffic management works including knee rail fencing, red route line marking, and access-controlled vehicle barriers, for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.

  • Accessible_WC_Refurbishment_NHS_Building_Surveying

    Accessible WC Refurbishments | Warneford Hospital, Oxford

    Design and project management of accessible WCs within live public environments for Oxford Health NHS Foundation Trust. RIBA Stages 2-6.

  • Mental_Health_Refurbishments_NHS_Virtual_CBS_Ltd

    Anti-Ligature Ironmongery Upgrades | Oxfordshire & Buckinghamshire

    Design and project management of anti-ligature ironmongery throughout the NHS Trust to windows and doors. Included full building survey, design, and contract administration. RIBA Stages 2-6. Oxford NHS Foundation Trust.

  • Damp_Water_Ingress_Leak_Detection_NHS

    Damp Ingress Surveys | Banbury, Oxfordshire

    Damp ingress survey to determine causes of water ingress. Defect diagnosis. Report and schedule of works. Horton General Hospital, Oxford University Hospitals NHS Trust.

  • Roof_Defect_Building_Surveying_Leak_Detection

    Water Ingress Survey | Haddenham, Buckinghamshire

    A water ingress survey was undertaken to determine the causes and remedial repairs to make the building watertight. NHS Property Services.

  • Roof_Surveys_Virtual_CBS_Ltd_Milton_Keynes

    Fire, Insulation and Roof Surveys | Marlborough House, Milton Keynes Hospital

    All roofs and voids were surveyed at Marlborough House (Milton Keynes) inpatient psychiatric ward for levels of insulation, fire stopping, and water ingress. Working within high security live environment.

  • Roof_Survey_NHS_High Wycombe

    Water Ingress Roof Survey | Harlow House, High Wycombe

    The roof survey highlighted several defects including failed patch repairs to this asphalt roof. A full report was undertaken and recommendations for refurbishment/repairs, including potential thermal improvements.

  • Condensation_Black_Mould_Surveys

    Condensation Survey | Buckinghamshire

    Our damp survey determined that the black mould growth to this ceiling was caused by lack of ventilation and lack of insulation to the roof, causing a large cold spot. A schedule of works was produced to refurbish the existing flat roof, with insulation over the deck (warm roof construction) and the installation of mechanical and natural ventilation to remove moist air from the building. The plasterboard ceilings were removed and new installed.

  • Roof_Maintenance_Survey_NHS_Virtual_CBS_Ltd

    Roof Survey | Buckinghamshire

    Our roof survey highlighted issues with the valley gutter, which was full of vegetation, causing internal water ingress. Problems with access made it hard to maintain. A report with recommendations was issued to NHS Property Services.

  • Temporary_Building_Refurbishment_Aylesbury_Virtual_CBS_Ltd

    Internal Refurbishment | Wing Unit, Aylesbury

    Full design and project management for the internal refurbishment of the Wing Unit, Aylesbury. A full refurbishment was carried out including new ceilings, plastering and decorations, new floors, replacement fire alarm, and electrical services, new WCs and kitchen. RIBA Stages 2-6.